Customization: | Available |
---|---|
Warranty: | 3 Year |
Ignition Mode: | Recoil Start |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | FSH2000D | FSH4000D | FSH5000D | FSH6500D |
Type | Brush ,single -phase | Brush ,single -phase | Brush ,single -phase | Brush ,single -phase |
Frequency (HZ) | 50/60 | 50/60 | 50/60 | |
Rated ACvotage(v) | 110/120/220/230/240 | 110/120/220/230/240 | 110/120/220/230/240 | 110/120/220/230/240 |
Rated output KVA | 1.8/.2.0 | 2.8/3.0 | 4.2/4.6 | 4.6/5.0 |
MAX OUTPUTKVA | 2.0/2.2 | 3.0/3.3 | 4.6/5.0 | 4.6/5.0 |
DC output | 12V-8.3A | 12V-8.3A | 12V-8.3A | 12V-8.3A |
Power factor | 1.0/0.8(Three phase ) | 1.0/0.8(Three phase ) | 1.0/0.8(Three phase ) | 1.0/0.8(Three phase ) |
Noise level (7m)db(A) | 77 | 77 | 77 | 77 |
Engine model | FSH170F | FSH178F | FSH186F | FSH186FA |
Fuel tank capacity(L) | 0.75 | 1.1 | 1.65 | 1.65 |
Engine type | OHV .4-stroke forced air -cooled | OHV,4-stroke rorced air -cooled | OHV 4-stroke forced air -cooled | |
Fuel tank capacity (L) | 12.5 | 12.5 | 12.5 | 12.5 |
Continuous operating hours(H) | 14/12 | 9/8 | 6.5/5.5 | 6.5/5.0 |
Lubricating system | Pressure splashed | Pressure splashed | Pressure splashed | Pressure splashed |
Start system | recoil start/electric start | Recoil start/electric start | Recoil start/electric start | Recoil start/electric start |
Packing size (L*W*H)mm | 650*490*570 | 650*490*570 | 725*495*620 | 725*495*620 |
20FT unit | 132 | 132 | 96 | 96 |
Net weight (KG) | 58 | 74 | 95 | 98 |
Q: What products are you manufacturing?
A: We manufacture and exporter of gasoline engine, gasoline water pump, gasoline power sprayer, gasoline generator, car washer and other agricultural products.
Q: Are you a factory or a trading company?
A: Manufacturer, we focus on the development and production of agricultural machinery more than 10 years.
Q: Whether to provide customized services?
A: Of course, OEM and ODM.
Q: How is your quality control?
A: We have a strict quality control system, from each spare part to each complete machine, to ensure that each product is
qualified before loading.
Q: What about the lead time for mass production?
A: Generally, it will take 15-20 days after receiving your advance payment. Some is 25-30days. The specific delivery time depends
on the items and the quantity of your order.
Q: How about warranty?
A: It's within 1 year after goods is discharged in the destination.